As the coefficient of performance (COP) of the heat pump system is 2, the waste heat delivered to the thermal energy storage tank is almost twice the heat pump energy content, resulting in more energy losses than the solar-only case. While the sizes of the electrolyser and heat pump are very similar across different LOHCs, there is a noticeable discrepancy in the sizes of hydrogenation and dehydrogenation reactors. Capacity factor of electrolyser, hydrogenation and dehydrogenation reactors, and heat pump for different LOHC-based HRS with (a) an onsite solar PV-driven electrolyser and (b) a grid-connected electrolyser. The capital cost for each equipment varies with its maximum power production or consumption rate, except for the hydrogenation and dehydrogenation reactors. A molten salt thermal energy storage tank uses a mixture of NaNO3 and KNO3 as the heat transfer fluid to store the heat from the heat pump for later use in the dehydrogenation reactor. This means that the larger sizes of the electrolyser, storage reactors, heat pumps, and thermal energy storage are required to accommodate the intermittency.
However, the waste heat content in the aggregate is equal in both cases because of the same aggregated amount of hydrogen production. One major difference between the two cases is the relative energy content sizes in the respective equipment, with the solar-only case being larger. Further losses that occurred at the end could be identified as an opportunity to improve energy efficiency and solve the intermittency in renewable electricity supply in the future.
Hydrogen production rate of the grid-connected electrolyser and hydrogen charging/discharging rate of the hydrogenation/dehydrogenation reactors from 1st to 7 January, considering the use of NEC/DNEC as LOHC pairs. The use of different LOHC materials is only considered in Scenarios 2 and 3, under the same analytical and modelling framework. This cost can be expressed as a fraction of the purchased cost of equipment, including free-on-board (FOB) costs. In this study, the electricity price is calculated on an hourly basis, which is the average of the two consecutive trading interval prices. The commercial liquid media used in the thermal energy storage tank is called solar salt, which is a mixture of 60 wt.% NaNO3 and 40 wt.% KNO3.
In the first paper, we proposed the ATHENA framework for the analysis and design of a strategic hydrogen refuelling infrastructure and considered a case study in Northern England. For simplicity, a single-stage heat pump is assumed to transfer low-temperature heat to the thermal energy storage tank operating at high temperatures in this study. Due to the high-temperature difference between the waste heat source and thermal energy storage tank, cascade heat pumps are an ideal solution to efficiently provide heat to the system at high temperatures.
Figure 14 shows the follow the source link thermal energy storage level for dehydrogenation. There are two main electricity supply sources to be considered, which are a) an onsite solar PV system and b) existing power plants. The variable operating cost is the total electricity cost for optimal scheduling of the HRS, including the electricity consumed by water electrolysis and other system components. The fixed operating cost includes the O&M cost of all equipment except for the solar PV system and PEM electrolyser. The capital and operating costs are the largest components of the total annualised cost.
The performance of the hydrogenation and dehydrogenation reactors is related to mass conversion and yield of hydrogen in a time series. As the hydrogen dispensation systems were the same for all scenarios, they were not considered as part of the analytical framework for technical feasibility and cost analysis. Figure 3 shows a simplified process diagram of the heat pump cycle integrated with a molten salt thermal energy storage tank. The thermal heat is transferred from the thermal energy storage tank through heat exchangers to the dehydrogenation reactor, when it is needed. This is due to the low-capacity factor of the solar-only case, resulting from the intermittency of solar electricity generation, compared to the grid-only case. However, the challenge at this stage is the energy losses, which are output as the energy losses in the form of heat produced in the PEM electrolyser and thermal energy storage tank.
However, the design capacity of the dehydrogenation reactor for NEC/DNEC with a solar PV price of A$2000 is nearly double that of other LOHCs. The design capacity of each piece of equipment is similar for the use of the same LOHC as shown in Fig. The design capacity of the dehydrogenation reactor is more sensitive to the changes in renewable energy prices than other LOHCs when using NEC/DNEC as LOHCs. The cost structure for equipment and electricity exported to the grid of different LOHC-based HRS when the capital costs of a solar PV system are (a) A$2000 (b) A$1500 (c) A$1000 respectively.
The capacity factors of the heat pump remain the same across the four pairs of LOHCs. DEC has the highest capacity factor of the hydrogenation reactor, while DBT has the highest capacity factor of the dehydrogenation reactor. The capacity factor of electrolyser, storage reactors and heat pump are compared in accordance with the optimal results for the selected LOHCs. The lower HPC is due to the smaller equipment sizes and higher capacity factor of the equipment. When considering solar power as the only electricity source for the HRS, the higher HPC is mainly due to the large equipment size required to accommodate intermittency.